Reference
Pilot project: speed increase to 150 km/h – D3 motorway
In this pilot project we participated in delivering the technological infrastructure for variable message signs enabling testing of increased maximum speeds of up to 150 km/h.
Our delivery included:
- manufacture of electrical switchboards
- electrical installation of the technological equipment
- integration of variable message signs (VMS)
- integration of the system into the superior traffic systems NDIC and DIS
The project is part of the modernisation of transport infrastructure aimed at improving safety and traffic flow.
More information: https://md.gov.cz/Media/Media-a-tiskove-zpravy/Rychlosti-az-150-km-h-mohou-ridici-zkusebne-projet
Technological infrastructure – Liberec city thoroughfare
We took part in the modernisation of the technological systems on the Liberec city thoroughfare by delivering electrical installations and integrating variable message signs.
Scope of the works:
- electrical installation for VMS gantries
- installation and integration of traffic control technologies
- integration into the tunnel technological system
- connection to the superior NDIC and DIS systems
The project contributes to improved safety and traffic flow on this major urban route.
More information: https://eurovia.vinci-construction.cz/blog/opravime-tri-useky-na-prutahu-libercem
Homole tunnel – VMS gantries and pre-tunnel signage
On this project we delivered the installation and integration of technological equipment for traffic control in the Homole tunnel area.
The delivery included:
- installation of gantry variable message signs (VMS)
- installation of pre-tunnel variable signage
- integration of traffic technologies
- connection to the central NDIC and DIS traffic systems
This system allows operative control of the traffic situation and increases safety in the tunnel section.
More information: https://apdos.roadmedia.cz/Upload/Stavby/59/infoletak_d35-vys-myto-dzbanov.pdf
D35 Hořice – Sadová – variable message signs
On the D35 Hořice – Sadová motorway section we delivered the installation and integration of traffic technologies for dynamic traffic management.
The project included:
- installation of VMS gantries
- installation of variable speed control signs
- installation of meteorological and temperature sensors
- integration into the superior NDIC and DIS systems
The goal of the solution is to provide drivers with up-to-date traffic information and increase safety on this motorway section.
More information: https://kraje.rsd.cz/kralovehradecky/dalnicni-usek-d35-horice-sadova/